Zhangzhou Yunping Expressway漳州云平高速公路

Projects > Road Engineering > Zhangzhou Yunping Expressway漳州云平高速公路

Zhangzhou Yunping Expressway漳州云平高速公路

Product name项目名称

Zhangzhou Yunping Expressway A2, A5, A6, A9 signs漳州云平高速A2A5A6A9

Construction unit建设单位

Hunan Road and Bridge Construction Group Co., Ltd., China Railway 24th Bureau, Fujian No. 1 Highway Engineering Company, CCCC No. 1 Public Bureau, Zhejiang Jiaotong Engineering Co., Ltd.,湖南路桥建设集团有限责任公司、中铁二十四局、福建省第一公路工程公司、中交一公局、浙江交工、

Project description项目描述

   

The starting point of the project is Wutian, Dongxia Town, Yunxiao County. The Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County. ; The mileage of the main line is 97.792 kilometers (including 78.017 kilometers of newly built mileage and 19.775 kilometers of the same line with the Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges.


A2 standard: the total length is 9.131km, the excavation is 806,442 square meters; the fill is 934,594 square meters; the bridge is 520m/2; the culvert is 770.68m/12; the channel is 425.48m/11;


Bid A5: The starting point of the project is near Baonan Village, Banzai Town, Pinghe County. The starting mileage is K56+226.2, which is connected to Shenhai Expressway. The ending point is Lianjian Village, Banzai Town, Pinghe County. middle), the total length of the route is 8.574 kilometers. It is constructed according to the standard of two-way 4-lane expressway, the design speed from the starting point to the end point is 80km/h, and the width of the roadbed is 24.5 meters. Among them, the engineering volume is 1.0399 million cubic meters of earthwork, 0.8 tunnels, 3 bridges, 7 culverts, 2 passages, 2 interchanges, and 1 service area.


Bid A6: The starting point of the project is Wutian, Dongxia Town, Yunxiao County, and the Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dapu Expressway). Zhangzhou branch line); the main line mileage is 97.792 kilometers (including 78.017 kilometers of newly-built mileage, and 19.775 kilometers of total line mileage with Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges.


Bid A9: located in Huangtian Village, Jiufeng Town, Pinghe County, passing through Yangmeiping, Chicaopu, passing through Jiufeng Tunnel, passing Shipaitang, and setting up the Jiufeng Main Line Toll Station (K95+500) at Xiadian, and the end point (Stake No. YK97+ 346.962=ZK97+339.223) is located in Kuishan Village, Changle Township, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dazhang Branch). The number of main projects includes 2025.25m/7 main bridges, 1248.1m/1.5 tunnels, 1 overpass of 86m, excavation of 2.9018 million cubic meters (about 29% of the stone), filling of 2.9232 million cubic meters, debit of 516,000 cubic meters, and Jiufeng One toll station on the main line, 13 RC cover culverts (including 7 road diversions), 5 tractor channel culverts, 6 round pipe culverts, there are provincial road S207 around, county road X571 (Xiuxiu Line) and rural areas along the line the way. The contract duration is 24 months, the contract amount is 469,754,009 yuan (including the tentative amount); the defect liability period: 2 years, and the warranty period is 5 years.

项目起点位于云霄县东厦镇浯田,设浯田枢纽互通与沈海高速公路相连,终点位于平和县九峰镇赤石附近,接广东大埔至潮州港高速公路漳州支线(简称大漳支线);主线里程97.792公里(其中新建里程78.017公里,与沈海复线共线里程19.775公里)。按双向4车道高速公路标准建设,起点至沈海复线段设计速度100Km/h,路基宽度26.0米;沈海复线至终点段设计速度80km/h,路基宽度24.5米。全线主要工程量有土石方2143m3、隧道7.5座、特大桥1座、大桥30座、涵洞(通道)133道(以上数据均不含互通区)、互通9处。

A2:全长9.131km挖方80.6442万方;填方93.4594万方;桥梁520m/2座;涵洞770.68m/12道;通道425.48m/11道;隧道1969.5m/1.5座;互通1处。

A5标:项目起点位平和县坂仔镇宝南村附近,起点里程K56+226.2,与沈海高速公路相连,终点位于平和县坂仔镇联建村,终点里程YK64+800(位于联建特长隧道中间),路线总长8.574公里。按双向4车道高速公路标准建设,起点至终点段设计速度80km/h ,路基宽度24.5米。其中工程量有土石方103.99万方、隧道0.8座、桥梁3座、涵洞7道、通道2道、互通2处、服务区1处。

A6标:项目起点位于云霄县东厦镇浯田,设浯田枢纽互通与沈海高速公路相连,终点位于平和县九峰镇赤石附近,接广东大埔至潮州港高速公路漳州支线(简称大漳支线);主线里程97.792公里(其中新建里程78.017公里,与沈海复线共线里程19.775公里)。按双向4车道高速公路标准建设,起点至沈海复线段设计速度100Km/h,路基宽度26.0米;沈海复线至终点段设计速度80km/h,路基宽度24.5米。全线主要工程量有土石方2143m3、隧道7.5座、特大桥1座、大桥30座、涵洞(通道)133道(以上数据均不含互通区)、互通9处。

A9标:位于平和县九峰镇黄田村,经洋梅坪、赤草埔,穿九峰隧道,经石排堂后在下店设置九峰主线收费站(K95+500),终点(桩号YK97+346.962=ZK97+339.223)位于平和县长乐乡葵山村,接广东大埔至潮州港高速公路漳州支线(简称大漳支线),路线总体走向为南西至北西向,路线总长7.737公里。主要工程数量包括主线桥梁2025.25m/7座,隧道1248.1m/1.5座,天桥186m,挖方290.18万方(石约占29%),填方292.32万方,借方51.6万方,设九峰主线收费站一处,RC盖板涵13(含改路7),拖拉机通道涵5道,圆管涵6道,周边有省道S207,沿线有县道X571(秀秀线)及乡村道路。合同工期24月,合同额469754009元(含暂列金额);缺陷责任期:2年,保修期5年。

 

Supply product供应产品

Squeezing material,grouting material,superplasticizer,accelerator, anti-folding agent and other admixtures压浆料、灌浆料、减水剂、速凝剂、抗折剂等多种外加剂