Guiyang Hub Southwest Ring Railway Project贵阳枢纽西南环铁路工程

Projects > Railway Engineering > Guiyang Hub Southwest Ring Railway Project贵阳枢纽西南环铁路工程

Guiyang Hub Southwest Ring Railway Project贵阳枢纽西南环铁路工程

Project name项目名称

Guiyang Hub Southwest Ring Railway Project贵阳枢纽西南环铁路工程

Construction unit建设单位

China Railway 16th Bureau Group Road and Bridge Engineering Co., Ltd.中铁十六局集团路桥工程有限公司

Project description项目描述

     The southwest ring railway of the Guiyang hub is designed as a class I double-track of the national railway, and together with the northeast ring of the city ring railway under construction, it forms the Guiyang city ring express railway. The starting and ending location of the line: Xiaobi (not included) - Qingzhen East - Baiyun (not included), the total length of the southwest ring line of the municipal express railway is about 72 kilometers, and there are more than 30 stations, including Baiyun Station, Longdongbao Station, Mazhai Station, Huaxi South Station, University Town Station, Tianhetan Station, Gui'an Station, Jinyang South Station, etc., the construction period is 3 years.  贵阳枢纽西南环线铁路设计为国铁Ⅰ级双线,与在建的环城铁路东北环组成贵阳市环城快速铁路。线路起讫地点:小碧(不含)—清镇东—白云(不含),市域快铁西南环线全长约72公里,共有30多个站点,包括白云站、龙洞堡站、马寨站、花溪南站、大学城站、天河潭站、贵安站、金阳南站等,建设工期3年。

Supply product供应产品

Squeezing material,grouting material压浆料、灌浆料