Product name项目名称

Fuping high-speed railway FPZQ-2 standard福平高铁FPZQ-2

Construction unit建设单位

China Railway 24th Bureau Group Co., Ltd.中铁二十四局集团有限公司

Project description项目描述

   

The new Fuzhou-Pingtan railway line starts from Fuzhou Railway Station, passes through Gushan, Fuzhou South Railway Station, Changle, Panasonic, and crosses Renyu Island, Xiaolian Island, Dalian Island in the Haitan Strait with bridges to Pingtan Island. The length of the line is about 88.5 kilometers. , of which the new length is 85.2 kilometers, and the coastal railway connection line is 3.3 kilometers. There are 6 stations in Fuzhou, Fuzhou South, Changle, Changle East, Panasonic and Pingtan on the whole line, of which Fuzhou and Fuzhou South are existing stations and the rest are newly established stations.


    This bidding section is the second bid for the new Fuzhou-Pingtan railway station front project. The project is located in Changle City, Fuzhou. It mainly passes through Yingqian Town, Shouzhan Town, Heshang Town, Guhuai Town, Jiangtian Town and Songxia Town. The starting mileage is DK25 +475.58, located at the end of Pingtan Taiwei of Xiahualing Super Bridge (excluding), the end mileage is DK59+415, passing through Elephant Mountain Tunnel, Shouzhan Super Bridge, Changle Super Bridge, Dailing Tunnel, Qinghu Super Bridge, Guhuai Super Bridge, Shimen Super Bridge, Gaofengshan Tunnel, Panasonic Tunnel, Panasonic Super Bridge, and finally the exit of Haimen Tunnel. There are Changle Station, Changle East Station and Panasonic Station in the middle. The total length of the line is 33.93942 kilometers, including 6 tunnels with a total length of 16.8 kilometers. The total length of the 17 seats is 10.7 kilometers. This bidding section includes the whole line of frame laying works, with a track laying of 189.32 kilometers and a total construction period of 66 months.

新建福州至平潭铁路线路起自福州站,经鼓山、福州南站、长乐、松下,以桥梁跨越海坛海峡人屿岛、小练岛、大练岛至平潭岛,线路长度约88.5公里,其中新建长度85.2公里,利用沿海铁路联络线3.3公里。全线设福州、福州南、长乐、长乐东、松下、平潭共6座车站,其中福州、福州南为既有站,其余为新设站。

    本标段为新建福州至平潭铁路站前工程2标,工程位于福州长乐市境内,主要经过营前镇、首占镇、鹤上镇、古槐镇、江田镇、松下镇,起点里程DK25+475.58,位于下华岭特大桥平潭台尾(不含),终点里程为DK59+415,经大象山隧道、首占特大桥、长乐特大桥、岱岭隧道、青湖特大桥、古槐特大桥、石门特大桥、高峰山隧道、松下隧道、松下特大桥,终于海门隧道出口,中间设长乐站、长乐东站、松下站,线路总长33.93942公里,其中隧道6座总长16.8公里,大小桥梁17座总长为10.7公里。本标段含全线铺架工程,铺轨189.32公里,总工期66个月。

Supply product供应产品

压浆料、灌浆料、膨胀剂